This is a house getting ready to be put on the market. Homeowner was going to install all new trim, doors, and floors. Scope started with just priming and painting the recently installed windows minus the casing. I offered to paint the casing after it was installed around the windows so as to patch nail holes and caulk the gaps. After the windows were prepped and primed we agreed to have me pre-finish 400ft of baseboard, 300ft of door casing, 7 passage door frames, 7 passage doors, and 14 bi-fold doors. Sprayed oil primer and water based enamel.