New Construction built in 2018 in Roseville. Owner/designer decided to go with the same off white on all the walls, ceilings, trim, and doors. Scope included: prime and paint all drywall, prime and spray all woodwork except the stairs and living rooms shelves to be stained to match the pre-finished cabinets. Scope crept to include fixing a very large list of mistakes made by everyone from the carpenters to the electricians. The general contractor left me a lot to fix and no time on the schedule to do it.